     Concrete Structures of the Midwest, Inc. : Scheduling

Concrete Structures utilizes the “Critical Path” method of scheduling, where the most important tasks in a project are identified and expedited. This method results in the shortest possible duration for concrete work, saving money and accelerating the overall completion of the client’s project.

Project plans are carefully analyzed, and together with historical data, a preliminary schedule is generated. Through collaboration with field professionals, estimators, and engineers, all activities are taken into consideration.

Throughout the term of the project, regular updates are generated and distributed electronically. At each update, the progress of the critical path is checked for delays. Management and field personnel are informed of such delays to allow for corrective action. Electronic archives are maintained for all projects as historical data.

Concrete Structures uses “Primavera Project Planner,” (P3) and “Microsoft Project Professional” for schedule generation, assuring compatibility with various construction software packages, such as “Expedition” and “Ice 2000.”




Click here to enlarge